Holmes - National Geospatial-Intelligence Agency (NGA)
In this episode, we break down NGA’s latest Holmes Task Order 3 — a $148.67M full and open opportunity focused on software maintenance and systems engineering for the GSR IT system. With 2–3 awards expected, we cover:
- Scope of work & key requirements
- Cybersecurity and code quality standards
- Timeline, compliance, and performance metrics
If you're a federal contractor or tech firm eyeing NGA opportunities, this episode is a must-listen.
Tune in now and get ahead of the competition.
Contact ProposalHelper at sales@proposalhelper.com to find similar opportunities and help you build a realistic and winning pipeline.
Okay, let's kick things off. Today we're going deep on a really interesting document. It's basically the playbook for keeping a key government IT system humming.
Speaker 2:That's right. We're looking at a performance work statement, a PWS. This one's from the National Geospatial Intelligence Agency, NGA.
Speaker 1:And it's pretty specific, isn't it?
Speaker 2:Very specific. It's task order three under a bigger NGA contract. They call HOMES and this task order it zeros right in on software maintenance for something called the GSR-IT system.
Speaker 1:So you can think of this PWS as, like the detailed instruction manual NGA hands over, it tells the contractor exactly how to maintain this really vital system, keep it running, keep it secure. Our mission today is really to cut through the government speak you know the jargon and pull out the key pieces. What does NGA really expect here? What are the maybe surprising details?
Speaker 2:Well, first let's place it like you said. It's a task order a TO. It lives under this bigger umbrella contract homes.
Speaker 1:Right. So the main contract sets the overall terms and this TO defines one specific job.
Speaker 2:Exactly, and the main purpose of this job Section 1.1 says it pretty clearly is providing software maintenance and also systems engineering services, all for the GSR system.
Speaker 1:It's about the day-to-day care, the upkeep.
Speaker 2:Yeah, ongoing work. Section 1.2 then clarifies the objective Tell the contractor what services are needed to maintain GSR, not just how it is now, but also thinking about its future state.
Speaker 1:And it needs to align with the bigger picture.
Speaker 2:Absolutely. It has to mesh with the objectives in that main homes contract. That main contract has its own big statement of work, the SOW. We'll probably mention that main SOW quite a bit.
Speaker 1:An IDIQ SOW.
Speaker 2:Right Indefinite delivery, indefinite quantity. It quite a bit An IDIQ SOW Right Indefinite delivery, indefinite quantity. It's a common way the government buys services like this. A lot of the foundational rules are in there.
Speaker 1:Got it. So this PWS we're looking at builds on that larger contract and the scope here section 1.5, is it tightly defined?
Speaker 2:Very. It says the contractor provides all software maintenance and systems engineering requirements for the GSR system, specifically as described in the service areas mentioned here.
Speaker 1:Okay, and which service areas are covered in this task order sections 2.3 and 2.5?.
Speaker 2:That's right. Software maintenance, section 2.3, and systems engineering, section 2.5. Those are the two focuses.
Speaker 1:And, importantly, it also says what's not covered by this specific task order right?
Speaker 2:Yes, very explicitly. It lists other service areas from the main homes contract that don't apply here, things like program management.
Speaker 1:Okay, what else?
Speaker 2:Let's see Development operations, so DevOps Also content management and transition services those are all out of scope for this TO.
Speaker 1:So it really is just focused on keeping the current system running smoothly, plus the engineering support for that.
Speaker 2:Exactly Laser focus.
Speaker 1:Okay. What about the timeframe? How long does this work go on for?
Speaker 2:Section 1.4.1 lays that out. It's a pretty standard structure. There's a one-year base period to start, then NGA has the option to extend it four times, each for one year.
Speaker 1:So that's five years potentially.
Speaker 2:Plus, there's another six-month option period after that. So, yeah, it could potentially stretch out to five and a half years. A significant commitment.
Speaker 1:And where does the work actually happen? Is it on-site?
Speaker 2:Ah, for that. Section 1.4.2 just points you back to the main IDIQ SOW. The big contract likely specifies the place of performance details. This task order just defines the work itself.
Speaker 1:Okay, that makes sense. And you mentioned referencing the main SOW, the actual core requirements for software maintenance and systems engineering, in sections 2.3 and 2.5. They also point back there.
Speaker 2:They do. Yes, they basically say go do the things described in those sections of the main SOW. But there's a key detail here, specific to this task order under software maintenance, section 2.3.2.
Speaker 1:Ah, okay, what's that? Something about how they work.
Speaker 2:Exactly, it gets into their process. It says the contractor shall implement features and these features are prioritized by the government, specifically during agile program, increment planning, pi planning.
Speaker 1:Interesting, so NGA dictates the priorities using an Agile framework.
Speaker 2:Yes, and it even names the tool. It says these features are tracked in NGA's USMS JRA project, specifically the one for GSR.
Speaker 1:Wow, that's quite specific. It's not just maintain the code, it's plug into our Agile planning cycles using our JRA instance. That tells you a lot about the required integration.
Speaker 2:It really does, and you know a lot of the other standard sections. You'd expect constraints in Section 3, other direct costs and travel in Section 4, security in 5, government property in 7, special requirements in 8. They mostly do the same thing.
Speaker 1:Point back to the main contract.
Speaker 2:Right. They refer you back to the more detailed clauses in the IDIQ SOW. This PWS acts kind of like an overlay, adding the specifics for this one task onto that broader agreement.
Speaker 1:Okay, that structure makes sense. Now, what about the appendices? There seem to be quite a few, a through H.
Speaker 2:Yeah, there are several and a similar pattern here. A bunch of them mainly just point back to the IDIQ SOW again.
Speaker 1:Like what.
Speaker 2:Well, appendix A, the acronyms list. Appendix C compliance and reference documents. Appendix D meeting requirements. Appendix F is the architecture document library and H is DevOps tier definitions.
Speaker 1:So useful references, but the real meat is in the main SOW for those.
Speaker 2:Pretty much. They're listed here for completeness often, but the appendices that are potentially specific to this task order are B and E.
Speaker 1:Okay, what's Appendix B?
Speaker 2:B is for the CDRLs. That stands for Contract Data Requirements Lists. It's the list of specific reports, documents or data the contractor has to deliver as part of this specific task.
Speaker 1:Gotcha Deliverables and Appendix E.
Speaker 2:Appendix E is titled key personnel.
Speaker 1:Okay, standard enough. Is there anything notable there?
Speaker 2:Actually, yes, it explicitly says not applicable for this task order.
Speaker 1:Oh, so, unlike some government jobs, they don't need the contractor to name specific government-approved key people for this maintenance task.
Speaker 2:Correct, at least not according to this PWS. It reduces some administrative overhead, maybe, but the performance expectations, as we'll see, are still sky high.
Speaker 1:Interesting detail. Now you mentioned something else, like I saw near the beginning a TBD-TBR list.
Speaker 2:Ah yes, Good catch. Tbd-tbr to be determined or to be resolved.
Speaker 1:What's the significance of having that list in the document?
Speaker 2:Well, it's a really important clue about the document status when this version was created. It signals that some pieces weren't fully locked down yet. The fact that items are marked open means decisions were still pending.
Speaker 1:Okay, and what was still open according to this list?
Speaker 2:Two items. Tbr001 was about finalizing those CDRLs the deliverables list we just talked about in Appendix B, specifically for this task order.
Speaker 1:And the second one.
Speaker 2:TBR 002 was about determining the performance measures that go into Appendix G.
Speaker 1:Wait a second. It says determining the performance measures was TBD, but Appendix G is in the document later and it's full of performance measures.
Speaker 2:Exactly. That's the slightly confusing part. It could mean a couple of things. Maybe this is an earlier draft and that TBD note just wasn't updated after Appendix G was filled in. Or maybe Appendix G was added later and they forgot to remove the TBR item. Either way, it suggests the document might have been put together iteratively or there was some fluidity in finalizing the details.
Speaker 1:Okay. Well, regardless of the TBD note, let's focus on Appendix G itself, because it does seem to contain the actual metrics. This is where they define success, right how well the contractor needs to perform.
Speaker 2:Absolutely. This is crucial. Appendix G lays out the specific performance objectives and, importantly, the acceptable performance levels or APLs. These are the concrete standards NGA will measure the contractor against for this GSR maintenance job. There are 10 of them listed S1 through S10.
Speaker 1:Right, let's walk through some examples. What are they measuring? Give us a flavor.
Speaker 2:Sure, let's take S1. That's about knowledge management. It gets really specific. It requires the accuracy of configuration items CIs in their database, the CMS.
Speaker 1:Oh accurate.
Speaker 2:Must exceed 95% accuracy and it also measures timeliness for updating those CIs 90% have to be updated within one week of a change and 95% within two weeks. Very precise.
Speaker 1:So it's not just fixing bugs, it's also meticulously tracking the system's components and changes. What about when things go wrong? Responsiveness, yep S2, software maintenance hits that. If the contractor detects an outage or system degradation, they have to notify NGA no later than 30 minutes after identifying it 30 minutes.
Speaker 2:That's a pretty tight window.
Speaker 1:It is especially for a complex system. Then you get into cybersecurity, which is obviously huge for NGA.
Speaker 2:How's that measured S3 and S4.
Speaker 1:Right. S3 is about fixing security findings, things identified through, say, FISMA audits that's the Federal Information Security Modernization Act. They have to mitigate or remediate those findings within NGA's required timelines.
Speaker 2:Okay, standard procedure. What about S4?
Speaker 1:S4 sets a really high bar. It demands 100 percent compliance with NGA security notifications, Things like IAVAs vulnerability alerts and STIGs, which are security configuration guides 100 percent 100 percent compliance, and it explicitly mentions enforcing zero trust initiatives as part of that. That 100 percent figure is the required APL. No room for error there.
Speaker 2:Wow, ok, 100 percent on security notifications is serious business. You mentioned Agile earlier. Are there metrics tied to that process? Yes, s5. It's called user story development Directly measures their Agile velocity. The contractor has to deliver a minimum of 90% of the user stories they committed to in each sprint or iteration plan.
Speaker 1:So a direct measure of their productivity within the Agile framework.
Speaker 2:Exactly Standard Agile metric, but formalized here as a performance requirement. Then there's testing S6 and S7 focus there.
Speaker 1:What do they require for testing?
Speaker 2:S6 is about automation. It requires that 90% of the software baseline for every release must be testable using automated tests in the actual customer environment.
Speaker 1:Pushing for automation and S7, results.
Speaker 2:S7 looks at the outcome. 95% of the test cases for each release have to pass and critically pass, without any liniments or conditional statements. They want clean passes 95% pass rate.
Speaker 1:Okay, s8 seems to dig even deeper into testing.
Speaker 2:It does. It talks about code coverage. S8 mandates a minimum of 90% code coverage by automated tests. But it adds a key phrase All areas of the code must be meaningfully tested.
Speaker 1:Meaningfully tested. So it's not just hitting a number, but ensuring the tests are actually effective.
Speaker 2:Right, they don't want gaming the metric. Now. S9 and S10, these are really interesting. They introduced something called the new standard for NGA software way.
Speaker 1:That sounds like a big deal.
Speaker 2:It really is these metrics S9 and S10, they clearly signal NGA pushing for very modern, high quality software practices, even in a maintenance context. S9 is called properly styled code.
Speaker 1:Okay, what's the standard?
Speaker 2:a maintenance context. S9 is called properly styled code. Okay, what's the standard? The standard is zero Zero linting errors and zero warnings for any new code introduced.
Speaker 1:Zero, as in absolutely none. That's ambitious for code style and static analysis.
Speaker 2:Extremely ambitious. For existing legacy code, the PWS says they get a year to bring it up to that zero standard in the deployed environment. But for new code zero errors, zero warnings, right away.
Speaker 1:Wow, okay, and S10, does it maintain that high bar?
Speaker 2:It does, maybe even raises it for security. S10 is secure code scanning, another new NGA software way standard.
Speaker 1:And the standard is, let me guess, zero.
Speaker 2:Got it Deployed. Code must be free of known static and runtime vulnerabilities. The standard zero critical findings, zero high findings and zero medium level findings.
Speaker 1:Zero critical high and medium vulnerabilities allowed in deployed code. That is incredibly strict.
Speaker 2:It's extremely strict. The text does mention that negotiation might be possible for medium and low findings, but it requires specific government approval. The target, especially for critical and high, is unequivocally zero before code goes live.
Speaker 1:These zero standards in S9 and S10 really jump out. They tell you so much about NGA's expectations for quality and security.
Speaker 2:Absolutely. They're probably the most revealing metrics in the whole appendix.
Speaker 1:So if we step back now, look at this whole PWS, all these details, what does it really tell us about NGA and how they manage critical systems like GSR?
Speaker 2:Well, first off, it shows this isn't just, you know, some generic contract template. It's a highly specific operational plan. It reveals NGA's priorities very clearly.
Speaker 1:And those priorities seem heavily focused on measurable outcomes.
Speaker 2:Definitely the intense focus on metrics, specific percentages, apls and especially those zero standards. It shows they are incredibly results-oriented. They define exactly what success looks like in quantifiable terms.
Speaker 1:It also highlights, as we saw a huge emphasis on cybersecurity, that 100% compliance, the zero trust mention, the zero tolerance for major vulnerabilities.
Speaker 2:And it shows their commitment to specific ways of working. They're mandating agile practices, integration with their tools like JRA, pushing hard on test automation, demanding rigorous code quality.
Speaker 1:It really paints a picture of the level of detail and, frankly, the rigor involved in government IT contracting, especially when it's for systems supporting national security. Success isn't fuzzy, it's nailed down.
Speaker 2:Right. The contractor doesn't have much wiggle room. They have to align precisely with NGA's technical standards their processes, everything down to how quickly they report an outage and the static analysis results of their code.
Speaker 1:And that TBD list we talked about earlier adds another layer suggesting these detailed plans can sometimes still be evolving right up to the last minute.
Speaker 2:True, it shows the dynamic nature of contracting sometimes.
Speaker 1:Okay. So to recap, we've explored this NGA Homes Task Order 3, PWS for the GSR system. We saw its specific focus on software maintenance and systems engineering, how it fits within the larger homes contract, referencing that main IDIQ SOW frequently.
Speaker 2:And we really dug into Appendix G, uncovering those incredibly detailed performance metrics, the specific percentages, the tight timelines and especially those demanding zero standards for code quality and security vulnerabilities.
Speaker 1:They paint a very clear picture of the high stakes and high expectations.
Speaker 2:No question about it.
Speaker 1:So here's something to think about maybe as we wrap up. Given this incredible level of detail, these really challenging targets demanding zero critical high and medium vulnerabilities in deployed code, zero linting errors, what does this intense focus on measurable near perfection really tell us about the sheer complexity and the undeniable high stakes of maintaining these kinds of systems, the systems that NGA relies on for its national security functions? It seems the margin for error is vanishingly small, and perhaps necessarily so.